DESIGN

Building a RO4350B insertion-loss budget

Total insertion loss includes conductor and dielectric attenuation, mismatch, launches, vias and components. It should be budgeted for a complete signal path at specified frequencies, temperatures and reference planes.

ENGINEERING ANSWER

Total insertion loss includes conductor and dielectric attenuation, mismatch, launches, vias and components. It should be budgeted for a complete signal path at specified frequencies, temperatures and reference planes.

What to decide before release

Separate distributed line loss from discontinuities. Use multiple line lengths to help distinguish fixture loss from propagation loss. Review return loss alongside insertion loss so a mismatch is not mistaken for material attenuation.

Checks to put in your design brief

  • List every path element
  • State the measurement reference planes
  • Keep margin for process variation

Important distinction

Do not promise a loss figure from the laminate data sheet without a defined circuit and test method.

Turn this into a design decision

Record your selected construction, the assumptions that affect this topic, and the evidence needed before release. Use the engineering workbench to prepare a preliminary calculation, then discuss the exact stackup and acceptance requirements with the fabricator.

Prepare a fabrication RFQ →

Sources & basis

Material facts follow the cited source. Design checks are preliminary guidance, not supplier process instructions.

Continue your research