DESIGN

RO4350B and FR-4 hybrid stackups

Hybrid construction can reserve RF material for critical fields while using another laminate elsewhere. Whether it lowers total cost depends on processing, bonding, yield and material procurement, not just the price of the core.

ENGINEERING ANSWER

Hybrid construction can reserve RF material for critical fields while using another laminate elsewhere. Whether it lowers total cost depends on processing, bonding, yield and material procurement, not just the price of the core.

What to decide before release

Ask the supplier for a construction it already supports. Confirm dielectric properties at every critical field region and check thermal/mechanical compatibility. A signal that changes layers may move into a different dielectric environment.

Checks to put in your design brief

  • Keep critical fields in characterized materials
  • Specify all bonding layers
  • Compare total fabricated cost

Important distinction

Do not assume every FR-4 prepreg can be substituted into a qualified RF hybrid.

Turn this into a design decision

Record your selected construction, the assumptions that affect this topic, and the evidence needed before release. Use the engineering workbench to prepare a preliminary calculation, then discuss the exact stackup and acceptance requirements with the fabricator.

Prepare a fabrication RFQ →

Sources & basis

Material facts follow the cited source. Design checks are preliminary guidance, not supplier process instructions.

Continue your research